EQUINIX

Assisted a Dutch GEN-SET builder to test max.power performances on all running power supply machinary for a large data centre located in Amsterdam.
​Their equipment containing at two different locations are 6 x MITSUBISHI and 6 x MTU 20V4000 a third location is still under construction and will contain several CATERPILLARS. The MITSUBISHI engines produce each 1632Kwm and the MTU engines each 2010Kwm. During performance testing I solved also a problem this client was facing for over one year. They couldn’t reach more than 85% of the MITSUBISHI output due to TURBO-SURGE after this point. My solution was technically easy as it was logical but the client was more than satisfied.