NIBULON-5 en 6
Nikolaev, Ukraine
After a long silent construction period Nibulon finally continued to build their last two push-tug boats. After a rough period of negotiating with their last shipyard “OKEAN” NIBULON decided to build the last two ships in their own recently facilitated yard. Without to much constructional errors I was able to commission these ships within the std. commissioning period of 5 days. In between each commissioning there was a period of 1 month they finalized their ships.
And I was privileged to witness a very unique ceremony, prior to my commissioning, performed by the highest priest of the Ukrainian Orthodox church and along me there were about 300 more people.